SHARE
(Image courtesy of Petrobras)

Petrobras has reported platform P-20 restarted production on Monday.

P-20 is deployed in Marlim field, Campos Basin.

The platform was shut down due to damage caused by a fire in its chemicals system on December 26, 2013.

The platform was closed for 102 days.

P-20 has an output capacity of 20,000 bpd.